Process

Day 0 to port, in fifteen days.

Four steps. Each one has a fixed duration and a fixed list of things you receive. Nothing moves to the next step until you sign off on the one before it.

  1. ConsultationDay 0–1
  2. EngineeringDay 1–4
  3. ProductionDay 4–12
  4. DeliveryDay 12–15
Artwork, a demo phone and glass blanks on the consultation bench

Step 01 · Day 0–1

Consultation

We quote what is actually buildable in our plant — not a catalogue price. Send your artwork, target quantity and the market you sell into; we come back with a proposal, a price band and a lead time.

  • If a spec can't be held at your target price, we say so here rather than at the sample stage.
  • Tooling cost is quoted separately and amortised over the first order where possible.
  • Mixed cartons across 3–5 product lines are priced as one line, one carton spec.
You receive
  • Written proposal
  • Price band per quantity tier
  • Lead-time estimate
1–2 days
CNC cutting a mould block under coolant on the tooling floor

Step 02 · Day 1–4

Engineering

Mould cut or adjusted, samples pressed and tested. This is where the 0.33 mm glass, the edge polish and the applicator tolerance get locked — before any production volume runs.

  • Two sample rounds are included. A third round only happens if the drawing changes.
  • Samples ship with a dimension drawing and a material confirmation sheet.
  • You approve the sample in writing; production does not start without it.
You receive
  • Physical sample
  • Dimension drawing
  • Material confirmation sheet
3 days
Optical film running through the laminating line

Step 03 · Day 4–12

Production

Five lines scheduled against your delivery date, every shift inspected. Injection moulding, CNC routing, laminating, screen printing and packing all run under one roof, so a change on one line doesn't wait on a supplier.

  • 100% visual inspection plus AQL sampling on every batch.
  • You get a scheduled start date before the first machine runs.
  • Pre-shipment photos are sent before the cartons are sealed, not after.
You receive
  • Production schedule
  • Inspection log
  • Pre-shipment photos
8 days · 1,000–10,000 pcs
Wrapped export cartons palletised at the loading bay

Step 04 · Day 12–15

Delivery

Packed, cleared and loaded. Export documentation is prepared in-house, so the port date you were quoted at the start is the date the container actually moves.

  • Cartons are packed to your retail spec — printed box, flocked insert, tissue.
  • Shipping mode (FOB Shenzhen or DDP) is agreed at consultation, not at loading.
  • Originals of the bill of lading are couriered after the balance is settled.
You receive
  • Packing list
  • Bill of lading
  • Commercial invoice
3 days
81 machines 40+ engineers Five lines, one roof 15 working days to port

Have a spec and a quantity? We'll come back with a date.

Start a quote →